FDOT schedules hearings on replacement of Howard Frankland Bridge
The Florida Department of Transportation has scheduled hearings in St. Petersburg and Tampa to give residents a chance to comment about plans to replace the northbound Howard Frankland Bridge. The span, which was reopened in January 1993, is nearing the end of its “serviceable life,” FDOT officials say. The FDOT is currently in the second phase of a long-range plan for replacing the bridge by conducting a comprehensive study that will help determine the location and conceptual design of feasible…